A static var generator CT burden check should cover the complete external secondary loop: both cable conductors, terminal and test-block connections, and the SVG current-input impedance. Compare that total with the current transformer's declared accuracy conditions at its rated secondary current. A correct ratio and correct polarity do not establish an acceptable burden. Excessive loop impedance can distort the feedback used for compensation, while an unnecessarily high CT burden rating does not automatically guarantee better measurement. Obtain the approved CT and SVG interface requirements before choosing cable size or extending an existing measurement circuit.
Why burden matters after polarity has been checked
The SVG calculates its compensation command from measured electrical quantities. If the current signal differs from the actual primary current, troubleshooting may incorrectly focus on converter capacity or controller settings. A reversed CT is one possible problem, but lead impedance, inappropriate secondary ratings and an unsuitable accuracy range create different measurement errors. Treat these as separate checks rather than repeatedly changing polarity until the display looks plausible.
Start with the operating context in the static var generator fundamentals guide. This article concerns conventional current-output CT interfaces. Voltage-output sensors, Rogowski coils and proprietary digital links require their own interface assessment. Do not apply a 1 A or 5 A burden calculation to a sensor merely because its housing resembles a current transformer.

The CHYN HYSVG static var generator is the relevant product family for this measurement review. Its photograph identifies the product; it cannot establish input burden, compatible CT types or maximum cable length for a particular supplied configuration. Request those values against the order drawing and controller revision.
Translate the CT rating into a loop budget
For an alternating-current measurement loop, burden is impedance and can contain resistance and reactance. At a stated secondary current, apparent burden is S = Is2|Z|, with S in volt-amperes, current in amperes and impedance in ohms. The US Bureau of Reclamation relay-testing guide, Appendix D, gives the corresponding burden conversion and distinguishes magnitude estimates from measurements that include phase angle.
When the manufacturer specifies external burden, do not count the CT's internal winding resistance as though it were another field accessory. It matters in the CT equivalent circuit, but the nameplate comparison must follow the manufacturer's definition. Likewise, do not subtract an impedance from a VA number. Put every input onto a common basis before combining it, and retain the original data sheet alongside the calculation.
A 5 VA rating at 5 A corresponds to an impedance magnitude of 0.20 ohm. That is a hypothetical nameplate conversion, not a universal SVG requirement. The accuracy class may apply only across a declared burden interval and burden power factor. Being below a stated upper VA number is therefore necessary in some applications but is not, by itself, a complete accuracy assessment.
Calculate both outgoing and returning cable resistance
Use the actual installed route rather than the straight-line distance between cabinets. For equal copper conductors, a first estimate is Rloop = 2ρL/A, where L is one-way route length in metres, A is conductor area in square millimetres and ρ is resistivity in ohm square millimetres per metre. The factor of two accounts for the return conductor. Obtain resistance at the expected operating temperature from the cable manufacturer for the final design.
As an illustrative calculation only, assume ρ = 0.0175, L = 20 m and A = 2.5 mm². The two conductors give 0.28 ohm. At a rated 5 A secondary current, their resistive burden is 7 VA before the SVG input and terminals are included. A hypothetical 5 VA CT would already exceed its external burden budget. No compensation setting can remove that physical lead resistance.
At 1 A the same assumed loop would dissipate 0.28 VA. This explains why secondary current matters strongly for a long route, but it is not permission to replace a 5 A CT with a 1 A unit. The SVG input hardware, scaling, wiring diagram, CT ratio and specified accuracy must all support the alternative. Record a proposed interface change as an engineering revision, not a field adjustment.
Build a component-by-component burden register
| Loop component | Evidence to collect | Decision before approval |
|---|---|---|
| CT secondary | Ratio, rated current, class and external burden range | Confirm compatibility with the SVG interface |
| Two cable conductors | Actual route, material, area and resistance at temperature | Include the full return path |
| Test block and terminals | Approved arrangement and verified connection condition | Resolve uncertain or unstable connections |
| SVG current input | Manufacturer impedance or VA at stated current | Convert onto the same calculation basis |
| Additional instruments | Approved series devices and their input impedance | Do not assume spare burden permits arbitrary sharing |
This register is a design review aid, not a list of permitted modifications. A circuit may satisfy a burden calculation and still violate the approved grounding, shielding or sensor-sharing arrangement. Keep the interface drawing as the governing connection record and identify unresolved values explicitly rather than entering zero for unknown components.
Distinguish burden error from other feedback problems
The NPTEL CT tutorial recap explains that CT ratio error increases with secondary burden. This supports checking the measurement circuit before concluding that an SVG module is undersized. It does not supply an error percentage for a particular installation or prove that all incorrect power-factor readings are burden-related.
Compare the installed ratio, phase mapping, reference voltage sequence and CT position with the approved drawings. Use the separate SVG CT polarity discussion for sign and orientation issues. If measurements remain inconsistent after correcting a mapping mistake, retain the burden review instead of assuming the first correction resolved every fault.
Check each phase independently. Different route lengths, damaged terminations or an unintended shared device may affect only one secondary loop. A total three-phase display can hide that asymmetry. Ask the commissioning team to record reference-instrument readings and SVG readings under the same stable load state, with the same sign convention and measurement point identified.
Verify the loop without creating an open-secondary hazard
A current-output CT secondary must not be opened while primary current flows. Circuit verification and connection changes belong to qualified personnel working under an approved isolation and CT short-circuiting procedure. Do not disconnect one lead to see whether the SVG alarm changes, and do not treat a stopped converter as proof that the upstream CT primary is de-energized.
Specify the required evidence in the test plan: circuit identification, safe isolation boundary, instrument suitability, approved test connections and the restoration record. Whether burden is calculated from verified components or measured with an approved test method depends on the installation. A resistance reading alone may not describe the whole AC burden when significant reactance is present.
After restoration, verify that temporary connections have been removed or returned to their operating positions as specified, secondary continuity is established, and all phases are correctly identified. Retain the signed check with the calculation. A sound calculation loses value if the final field circuit differs from the drawing used to produce it.
What to include in an SVG enquiry or cable-extension request
Send the primary operating-current range, proposed CT ratio, rated secondary current, accuracy class, burden range and applicable data sheets. Include the SVG model and input specification, cable route and conductor details, test-block arrangement, grounding drawing and any devices sharing the signal. State whether the project is a new installation or an extension of an existing circuit.
For a cable extension, compare the before-and-after loop on the same temperature and current basis. Do not approve the change solely because compensation worked before the extension. Retain any known measurement uncertainty and ask the manufacturer to confirm the final interface. The related parallel SVG coordination guide covers a different decision: how multiple compensators share measurements and control responsibility.
Define acceptance before energization: approved documents, verified loop components, reconciled instrument results and closed installation deviations. Avoid a vague instruction to achieve unity power factor under every operating condition. A traceable measurement interface provides a defensible starting point for checking compensation performance against the actual project target.
Further learning: instrument-transformer principles
The NPTEL lecture below explains potential and current transformers. Use it to understand how the measurement interface works; it is not a CHYN commissioning procedure or permission to handle an energized CT circuit.
Watch the educational lecture on YouTube.
Frequently asked questions
Does a larger VA CT always improve SVG accuracy?
No. Select a CT whose declared class and burden range match the complete installed interface. A higher upper rating alone does not establish accuracy at the actual burden or operating current.
Should cable length mean one conductor or the whole loop?
State the convention explicitly. In R = 2ρL/A, L is the one-way route and the factor of two includes the return conductor. Use actual installed lengths if the two paths differ.
Can I change from a 5 A CT to a 1 A CT to reduce burden?
Only after confirming the complete SVG interface supports that change. Hardware input rating, scaling, ratio, accuracy and drawings must agree; the lower cable burden does not establish compatibility.
Can acceptable burden replace a commissioning comparison?
No. It supports the design review, while field checks establish that the installed circuit matches the design and reports plausible phase-resolved values under an identified operating condition.